General Re-Ordering Procedure Stock Level Procurement

The “re-ordering point” procedure is?   


SALMAN SAHIN
@sahinsalman876 | Updated 20 Dec. 2018


a. The moment where the material is re-ordered during MRP run; b. The safety stock level specified in the material master; c. The level of inventory which triggers material procurement if the stock level falls below this limit, this re-ordering point level is specified in the material master in the view MRP 1; d. The minimum order quantity specified in the supplier info record