How to create PR or PO by MRP?   


SURI PUCHHKUNDA
@[email protected] | Updated 19 Dec. 2018


The PR is created according to the safety stock mentioned for the material or can be triggered by a requirement. For creating a PO, you need to have the scheduling agreement in place. After the MRP is run the schedule lines are generated which are nothing but the PO.